Dry run testing

Of course, before putting it to actual use, it has to be checked and adjusted in dry runs.

The various bits 'n pieces are shown here w/out murky electrolyte getting in the way!

Dangler position

Dangler position

Checking overall dangler positioning for best electrical contact.

System take-down

System take-down

Checking ease of take-apart.

Last check

Last check

Final check w/completed dangler.

Dangler has the wire running down the hose (which increased overall stiffness), so original positioning needed to be reverified.

Website by SZP