The Core Box

Everything was glued together with yellow carpenters glue, and screwed together with #6 wood screws, countersunk, and putty filled.

The front and two sides, glued, screwed and clamped together.

The back, top and bottom pieces are in-place to keep it all square, but are not permanently mounted until later.

The 3 sided unit with the left-right cross braces in place.
The 3 sided unit with the front-back cross braces, acoustic foam, and stuffing netting in place
A closer shot of the bottom part of the box.

The netting prevents the stuffing from falling into the driver.

The bottom panel, with foam and cup cutout, ready to be put in place.
The top of the box. Kept in place with #8 screws, it will allow me to change stuffing density
The 2 basic boxes, with drivers mounted, ready for rattle & leak testing.

No sense going on with the veneer if it wasn't solid at this point!